ADVICE - INSTALLATION OF A « BASIC » PARQUET FLOOR

For all technical questions during the installation of your deck or advice in the choice of materials, call the customer service from Monday to Friday from 8:00 am to 8:00 pm at 04 73 91 24 97 and Saturday from 8:00 am to 8:00 pm at 06 07 94 17 42.
MATERIALS NEEDED
  • - Oxidizer (depending on the surface)
  • - Stratiprim primer (ref. ST500)
  • - MSPS parquet glue (ref. CO5MSPS)
  • - Possibly leveling compound (ref. RA15000, RA5000)
  • - Plastic bag, paper towel
  • - Orbital or belt sander
INSTRUCTIONS
STEP 1 - Support
- Make sure it is clean and dry.
- For new slabs, wait 4 weeks for drying.
Regarding the smoothing cement wait 1 week minimum.
On old tiles, clean with an oxidin type laundry then rinse thoroughly and ensure that the temperature of the premises is 15-20 ° C and that the hygrometry of the room is about 50%.
STEP 2 - Preparation
- Open the packaging and place the floor on the floor of the future room to be used for a few days so that it adapts to the hygrometry of the room.
Never put a floor whose humidity is higher than 12%!
NB: On heated floors check the compatibility of the floor, turn on the heating for 1 week then cut the 24 hours before installation. Perform the steps below. After gluing, wait at least 1 week before turning on the heat very gradually.
STEP 3 - Implementation
- If the floor is porous, use our Stratiprim primer, spread the MSPS adhesive (about 1.5 kg per m²) with a 3mm notched trowel.
STEP 4 - Pose
- Paste plot by plot.
- Then lay the blades on the floor as you go. The floor must be stopped about 5mm from the edge of the walls.
STEP 5 - Drying
- The parquet gluing is dry in 24 hours minimum.
STEP 6 - Sanding
- Carry out a slight finishing ginning to avoid any disassembly.
STEP 7 - Finishing
- Apply the desired treatment (vitrimat, sealer or other vitrifying) on ​​a clean floor.